Category:Indonesian Civil War
Category:Politics of Indonesia
Category:History of Java
Category:History of Indonesia
Category:History of Sumatra
Category:1956 in Indonesiapackage com.zhengsr.tablayoutlib.widget;
import android.content.Context;
import android.util.AttributeSet;
import android.widget.ListView;
/**
* Created by yzheng on 16/5/10.
* 在ListView中,setSelection()可以指定所有被选中的状态
* 如果你想自定义选中变为第一次选中状态,可以给该View设置setSelected(true)和setSelected(false)的
* 对应操作(如果不设置,就是第一次选中)
*
* @author yuzhe Zheng
*/
public class MySelectorListView extends ListView {
public MySelectorListView(Context context) {
super(context);
}
public MySelectorListView(Context context, AttributeSet attrs) {
super(context, attrs);
}
public MySelectorListView(Context context, AttributeSet attrs, int defStyleAttr) {
super(context, attrs, defStyleAttr);
}
@Override
protected void setSelected(boolean selected) {
super.setSelected(selected);
if (!selected) {
setSelected(true);
}
}
}
The objective of this research is to develop new treatment strategies for cocaine abuse by understanding the contribution 01e38acffe
Manajemen & Pasaribu - The Future of Hotel Management in the 21st Century
Category:Business management/*
* Software License Agreement (BSD License)
*
* Copyright (c) 2011-2014, Willow Garage, Inc.
* Copyright (c) 2014-2016, Open Source Robotics Foundation
* All rights reserved.
*
* Redistribution and use in source and binary forms, with or without
* modification, are permitted provided that the following conditions
* are met:
*
* * Redistributions of source code must retain the above copyright
* notice, this list of conditions and the following disclaimer.
* * Redistributions in binary form must reproduce the above
* copyright notice, this list of conditions and the following
* disclaimer in the documentation and/or other materials provided
* with the distribution.
* * Neither the name of Open Source Robotics Foundation nor the names of its
* contributors may be used to endorse or promote products derived
* from this software without specific prior written permission.
*
* THIS SOFTWARE IS PROVIDED BY THE COPYRIGHT HOLDERS AND CONTRIBUTORS
* "AS IS" AND ANY EXPRESS OR IMPLIED WARRANTIES, INCLUDING, BUT NOT
* LIMITED TO, THE IMPLIED WARRANTIES OF MERCHANTABILITY AND FITNESS
* FOR A PARTICULAR PURPOSE ARE DISCLAIMED. IN NO EVENT SHALL THE
* COPYRIGHT OWNER OR CONTRIBUTORS BE LIABLE FOR ANY DIRECT, INDIRECT,
* INCIDENTAL, SPECIAL, EXEMPLARY, OR CONSEQUENTIAL DAMAGES (INCLUDING,
* BUT NOT LIMITED TO, PROCUREMENT OF SUBSTITUTE GOODS OR SERVICES;
* LOSS OF USE, DATA, OR PROFITS; OR BUSINESS INTERRUPTION) HOWEVER
* CAUSED AND ON ANY THEORY OF LIABILITY, WHETHER IN CONTRACT, STRICT
* LIABILITY, OR TORT (INCLUDING NEGLIGENCE OR OTHERWISE) ARISING IN
* ANY WAY OUT OF THE USE OF THIS SOFTWARE, EVEN IF ADVISED OF THE
Related links: